Project Scope:

This mega plant spreads over 5,000 square meters and includes multiple dual compressor duplex centrifugal chillers in parallel providing 70,000 TR of cooling in addition to 3 TES Tanks.

Primary-Secondary pumping arrangement through six 3.3 kV VFD driven pumps connected to the buried network pipes feeding to the ETS located throughout the development. Further, TES tanks provide another 20,000 TR of cooling.

Process:

District Cooling provides chilled water from a centralized cooling station, through a network of pipes, for air-conditioning purposes.

Our Solution:

Redundant Allen-Bradley ControlLogix PLC System; Redundant Rockwell Automation FactoryTalk View Site Edition SCADA System, and Endress-Hauser Instrumentation system.