Project Scope:

King Saud University Endowment comprises of 11 separate buildings/towers that includes a convention center/mall, offices & a 7-star hotel tower of 50 floors, a medical building, a 5-Star Hotel of 250 Keys, 2 hotel (suites) buildings and 5 office buildings of different heights.

This is a full execution of all Mechanical and Electrical processes of the District Cool Plant. The project will be providing a capacity of fifteen thousand tons of refrigeration (15,000 TR) of combined air-cooled and water cooled chilling plant and a TES tank serving 680,000 sq.m. of build up area at King Saud University in Riyadh, Saudi Arabia. The plant is designed around utmost reliability, high performance, and maximum operability.

Process:

District Cooling provides chilled water from a centralized cooling station, through a network of pipes, for air-conditioning purposes.

Our Solution:

Redundant Allen-Bradley ControlLogix PLC System; Redundant Rockwell Automation FactoryTalk View Site Edition SCADA System, and ABB Instrumentation system.