Project Scope:

This Plant was constructed in 2005 by Palm Utilities but never commissioned and was taken over in 2014 by Empower. The scope of this project was to re-commission the plant equipment and install a brand-new control and SCAD system with additional instruments to achieve an optimal plant operation.

Process:

District Cooling provides chilled water from a centralized cooling station, through a network of pipes, for air-conditioning purposes.

Our Solution:

Redundant Allen-Bradley ControlLogix PLC System; Redundant Rockwell Automation FactoryTalk View Site Edition SCADA System, Historian and Reporting, and Endress-Hauser Instrumentation system