Project Scope:

The project is organized to increase the water injection capacity to cover Safah North-B by enhancing oil recovery operation from the field through injecting water in the proposed new wells.

The new water system is planned to handle all the forecasted produced water in addition to the fresh water for covering the shortfall.

The new water injection well will be a mix of debottlenecking the existing facility of water injection network in addition to the 16 new water injection pumps.

Our Solution:

ControlLogix Redundant System and IOs