Project Scope:

Occidental Oman Gas LLC intends to produce up to 50 MMSCFD of gas by August 2015 from Fushaigah field located in block 62 of Oman.

This will offset an anticipated 2015 fourth quarter gas deficit in Oman of 210 MMSCFD. The field is expected to produce at peak rates for 7 years and requires the design of well pads, a manifold, a pipeline, a pig launcher, receiver and remote utilities. Gas custody is transferred to the KGP inlet battery limit is within Detail Design scope. Utilities at the downstream of pipeline pig receiver and at multiphase meter skid will be provided by the KGP.

Our Solution:

Redundant ControlLogix System and IOs