Project Scope:

The project is providing a capacity of twenty thousand tons of refrigeration (25,000 TR) including TES tank, and serving the ADNEC district of hotels, office buildings, and conference centers.

The project includes the construction of the plant in its entirety, 20,000TR of series counter flow chillers and associated equipment, and a distribution network of over 2 Km (900mm pre-insulated pipes).

Process:

District Cooling provides chilled water from a centralized cooling station, through a network of pipes, for air-conditioning purposes.

Our Solution:

Redundant Allen-Bradley ControlLogix PLC System; Redundant Rockwell Automation FactoryTalk View Site Edition SCADA System, and Endress-Hauser Instrumentation system.